Call Us Now! +86-551-63853683 Sales@climatechambers.com
You are here:Home >> Support >> Latest News

Support

Support

Contact Us

Symor Instrument Equipment Co.,Ltd
Email: Sales@climatechambers.com
Tel: +86-551-63853683, 68663630
Shanghai office 
No.3215,Huhang Highway,Fengxian District, Shanghai, 231417,China
Hefei office
No.105 Dayang Industrial Park
Luyang District, Hefei, 230041, China

Latest News

Dust removal in temperature and humidity Test Chamber (1/2)

The condenser should be maintained regularly and monthly, and dust attached to the condenser heat dissipation mesh should be removed by vacuum cleaner or dust by high pressure air spray.

The repalcement the wet ball test cloth in temperature and humidity test chamber.
-When its surface is not clean or hard, or after the temperature control is finished, the test cloth must be replaced before continuing to do the temperature and humidity control. The test cloth should be replaced once every three months. When changing, clean cloth should be used to wipe the temperature measuring unit [Sen-sor]. When replacing the new test cloth, it should be cleaned first.

The inspection and adjustment of the wet ball water level in the chamber
-The water level in the tank should not be too high, so that the water overflow water tube or too low makes the wet ball test cloth water absorption abnormal, and the accuracy of the wet ball water level can be kept about 60% full. 
  • Previous:What is dust test chamber?  2021/12/24
  • Next:What is humidity control dry cabinet?  2019/05/17
  • Copyright © 2001-2021 Symor Instrument Equipment Co., Ltd. All Rights Reserved